Spring 2024 - Week 7: March 4, 2024 - March 8, 2024
Introduction Last week, we were able to clean up our left fragment and get it into the -20℃ freezer. It was the last fragment that we needed to clean in order to start assembling them together. The goal for this week is to do Gibson Assembly. Methods 3/5/2024 I started off the week by making more media so that we could use it later on in the week or after spring break. Since our media would be going bad during spring break, I wanted to make new ones to use after assembly. I wouldn’t want older media to cause us to have unwanted results. I made 100 ml of TGY broth, 100 ml of LB broth, and 200 ml of LB + agar. We also planned out how we will be plating the bacteria after assembly. We decided on having 8 plates total that will include a negative control, positive control, and two sets of experimentals. We will be doing four plates with no antibiotic and four plates with ampicillin. 3/6/2024 We poured plates to have them ready for after assem...